Archives: Case Studies

  • GSA-BFC Relocation

    INSTALL Warranty Contractor Image Flooring LLC was awarded the GSA-BFC relocation, a multi-story, phased renovation of an existing space. Their expert team used bright colors and an open floor plan to create a contemporary feel.

    Read More

  • INSTALL Flooring Istallation at Surrey Memorial Hospital Critical Care Tower

    Surrey Memorial Hospital Critical Care Tower

    Moisture and substrate preparation are the leading causes of healthcare flooring failure. An INSTALL contractor was able to address moisture and mold in installing more than 400,000 square feet of new flooring.

    Read More

  • INSTALL Flooring Installation at Summa Health Systems

    Summa Health Systems

    This Ohio nonprofit was so impressed with the work of INSTALL contractors, it began requiring all future floor installations be done by INSTALL certified floorcovering professionals.

    Read More

  • INSTALL Flooring Installation at Nemours Alfred I. DuPont Hospital for Children

    Nemours Alfred I. duPont Hospital for Children

    This expansion project required more than a quarter-million square feet of new flooring. An INSTALL Warranty Contractor was able to provide the necessary moisture remediation and flooring installation.

    Read More

  • South Jersey Technology Partnership

    After working with an INSTALL Warranty Contractor, SJTP wrote INSTALL into its floorcovering standards. Now all South New Jersey school districts that work with SJTP receive the same high-quality installation.

    Read More

  • Kennedy Space Center Astronaut Encounter

    The Kennedy Space Center worked with Mr. David’s Flooring International to completely transform the multi-room national treasure with a futuristic design that incorporates the latest flooring technology.

    Read More

  • Hensville Development Project

    Commercial Flooring of Toledo, having received INSTALL training and certification on the specified product, was uniquely suited for this large revitalization project and interesting flooring installation solution.

    Read More

  • Vancouver International Airport

    One of Canada’s busiest travel hubs needed renovations after years of heavy use. Maxwell Floors was awarded the work and set the standard for the airport, including specifications for five other projects.

    Read More

  • Unilever Manufacturing Facility

    Master Craft Carpet Service needed to replace an existing contractor facing problems on the nearly completed facility. Quickly bringing the project back to scope, much of their required skills can be attributed to the INSTALL training facility in Las Vegas.

    Read More