NIHCS Fort Wayne Campus
To address lingering accessibility, maintenance and infection-control concerns, the U.S. VA’s NIHCS Fort Wayne Campus overhauled its flooring installation and overall healthcare environment with the help of INSTALL Warranty Contractor Santarossa Mosaic and Tile.
-
Edward Hines, Jr. VA Hospital
With 13,000 square-feet of flooring, the Edward Hines, Jr. VA Hospital installation was challenging. But, thanks to certified INSTALL training, NuVeterans Construction Services completed the project with minimal disruption to patients and staff.
-
Alice Corporate Campus
This incredibly creative project by Mr. David’s Flooring was not only rewarded with a happy client, it was also bestowed with the honor of a 2017 Starnet Design Award – The Excellence in Imagination Award.
-
Axion RMS Headquarters
INSTALL Warranty Contractor Vortex Commercial Flooring managed a tight timeline, custom colors and a specific budget, to finish Axion’s RMS headquarters on time, on budget and to great fanfare.
-
T-Mobile Arena
Master Craft Floors, LLC faced a timeline and design spec as ambitious as the arena itself. But, its team of 40+ INSTALL-trained floorcovering professionals met the challenge and installed over four hundred thousand square feet of award winning results.
-
NBC Sports 2016 Summer Olympics Studio
ReSource New Jersey’s INSTALL-certified installation team couldn’t be deterred by limited supplies and time, or the challenge of working on another continent, to complete the award winning space for NBC’s 2016 Summer Olympics’ coverage.
-
AIMIA Corporate Office
INSTALL Warranty Contractor Sonus Interiors relocated AIMIA’s U.S. corporate headquarters to a retrofitted historic location in downtown Minneapolis. Working in an open-concept, Sonus seamlessly blended design elements while utilizing a dizzying array of flooring products.
-
University Health’s Truman Medical Center
Truman Medical Center is Kansas City’s only freestanding outpatient specialty and surgery center. Image Flooring treated each floor of the four-story building’s 90,000 square feet as its own project, with offices literally opening around them as areas were completed.
-
Menorah Medical Center
Menorah Medical Center’s Family Birthing Center project stands out for both the complex flooring installation and phased timeline that INSTALL Warranty Contractor Image Flooring executed flawlessly, in a fully functional acute care center.